 |
Recommendations for machine
tool placement to minimize installation costs, and
increase efficiency.
|
 |
Analysis of dirty coolant collection,
such as, sumps, in floor trenching, or overhead piping.
|
 |
Economic analysis of chip collection
and handling.
|
 |
Specifications of components and lists
of recommended spare parts
|
 |
Engineering drawings of piping, coolant chutes
or trenching at individual machine tools or central
systems
|
 |
Design of electrical monitoring and PLC control
systems
|
 |
Documentation necessary for installation contractor
bidding
|